Use the following role design as an editorial diagnostic, not a claim that all these exact titles are currently advertised.

| Responsibility | What the person must own | Practical evidence in an interview | Failure if missing |
|---|---|---|---|
| Executive sponsor | Trade-offs with the operating plan | Instance of stopping a project and reallocating resources | AI remains a side project |
| Workflow/product owner | Requirements, acceptance and adoption | Process map with exceptions and decision rights | Engineering delivers the wrong outcome |
| Finance/benefits lead | Baseline, capture and reconciliation | A defensible monthly bridge with overlap checks | Productivity becomes unsupported earnings claims |
| Data/integration lead | Access, quality and system handoffs | Failure/retry design and actual system constraints | Deployment stalls outside the model |
| AI/automation engineer | Evaluation, implementation and maintenance | Production incident, test set and recovery explanation | Demo quality is mistaken for reliability |
| Security/privacy/legal owner | Permitted use and appropriate controls | A concrete applicability decision and approved data flow | Reviews arrive late or responsibilities are unclear |
| Change/operations lead | Training, standard work and capture actions | Adoption data and an implemented process change | Old and new processes run in parallel |
| Service/support owner | Incidents, updates and ongoing economics | Support runbook and escalation evidence | Unplanned recurring labour erodes the case |
One person may cover more than one responsibility, but that does not remove the work. Assign hours and deputies rather than creating a nominal committee with no capacity.
SECTION REFERENCES
This page has no direct source links. The section’s reference list provides the wider evidence base.
Read the section references