runrate.
SECTION 05 / Hiring signals

How should the CFO use published salary bands?

Runrate research deskSection 05Page 5 of 12Last updated 13 November 2026

Use them as specific observations about particular employer roles. Do not turn a salary into a consulting day rate or assume a company can recruit the same capability at the midpoint.

An internal cost model should separately consider salary, employer costs, incentive arrangements, recruiting, management, tools and the proportion of time actually available. An external proposal includes different overheads, commitments and margins. Only a scope-and-output comparison can make the two routes comparable.

The postings above also span seniorities and geographies. Comparing an EY senior associate with a KPMG director and calling the difference an “AI premium” would be invalid. The Accordion engineering range explicitly spans multiple levels, so even that row is not a single-level benchmark.