Use a shadow or restricted deployment before allowing outputs to affect live transactions. Preserve the current process as a fallback. Compare with a contemporaneous control group where feasible; otherwise document changes in mix, seasonality, staff and other programmes.
Predefine denominators. “Accuracy” can mean correct fields, correct documents or successful end-to-end transactions; those are different. Report serious errors separately rather than hiding them in a high overall average. Set limits for human review, response time, exception backlog, failed integrations and total cost per accepted completion.
Documents: test protocol, frozen test set, exception log, release checklist, runbook and training record. Contact: frontline users, quality lead, security and system owner. Pitfall: passing a small easy-case test while the live backlog becomes someone else’s problem. Completion test: the authorised release group signs the measured results and rollback conditions.
This page has no direct source links. The section’s reference list provides the wider evidence base.
Read the section references