Stage 7: How do we prove it safely? Run a measured operational test.

Runrate research deskSection 02Page 8 of 15Last updated 13 November 2026

Use a shadow or restricted deployment before allowing outputs to affect live transactions. Preserve the current process as a fallback. Compare with a contemporaneous control group where feasible; otherwise document changes in mix, seasonality, staff and other programmes.

Predefine denominators. “Accuracy” can mean correct fields, correct documents or successful end-to-end transactions; those are different. Report serious errors separately rather than hiding them in a high overall average. Set limits for human review, response time, exception backlog, failed integrations and total cost per accepted completion.

Documents: test protocol, frozen test set, exception log, release checklist, runbook and training record. Contact: frontline users, quality lead, security and system owner. Pitfall: passing a small easy-case test while the live backlog becomes someone else’s problem. Completion test: the authorised release group signs the measured results and rollback conditions.